Upcoming Trade Shows CHINA HI-TECH FAIR 2008 Location: Shenzhen Convention and Exhibition Center Date: 12-17 October 2008 Booth Number: 2C52 Contact : Mr. Gordon Chen
Switching Power Supply Solar-Array Latchup(3 of 4)
Solvability
Determine the stable operating points and how to move from an undesired stable operating point to the desired stable operating point. The pragmatic solution to the real latchup problem (getting the system to unlatch) is to reduce the load (load shedding) or increase the output of the solar array by pointing it more directly at the sun.