• 简体
  • 繁體
  • Nederlands
  • English
  • Français
  • Deutsch
  • Italiano
  • 日本語
  • 한국어
  • Português
  • русском
  • Español
  • Svenska
  • Thai

新闻快讯

仰首是春,俯首是秋。2008年翩跹而至,也迎来了茂硕电源的十载耕耘。岁月如歌,春华秋实。我们已走过日新月异、不断开拓创新的十年,正是在您诚挚的关爱与支持下,我们取得了丰硕的成果。感谢您!
 
Sign up for PayPal and start accepting credit card payments instantly. 8 kB

特色产品

72W桌面式适配器
72W桌面式适配器
LED隧道灯电源
LED隧道灯电源
SMPS - 90W开关电源/交流转直流/桌面系列开关电源SMPS
SMPS - 90W开关电源/交流转直流/桌面系列开关电源SMPS
100/120W桌面适配器
100/120W桌面适配器

随机展示

EI-57 AC/AC AC/DC适配器
EI-57 AC/AC AC/DC适配器
SMPS - 9.68W多路裸板系列/交流转直流 | Open Frame SMPS
SMPS - 9.68W多路裸板系列/交流转直流 | Open Frame SMPS
SMPS - 8.5W多路裸板系列/交流转直流 | Open Frame SMPS
SMPS - 8.5W多路裸板系列/交流转直流 | Open Frame SMPS
24W开关电源 | 交流转直流开关电源 | 插墙系列立式、卧式开关电源
24W开关电源 | 交流转直流开关电源 | 插墙系列立式、卧式开关电源

首页 arrow 电源博客 arrow Power Supply Sequencing

Power Supply Sequencing

Question: In what order should you sequence power supply bias power on and off?

Original Question: I am trying to build a SMPS. Having had to repair such PSUs twice, I thought I might try to build one for experience. I am using half-bridge at 25kHz, TL 494 controller, input 240 V AC, output 24 V 30 A DC. I am driving MOSFETS with bipolar transistors through trigger transformers. I have voltage and amps control. To make it easier to trouble-shoot, I am using a separate 24 V DC PSU from the AC supply, for the controller. (03-05-2001)

My questions are:

  • In what order should I switch on everything?
  • Should the bipolar transistors be on before I start the controller?
  • Is the use of soft-start critical?
  • Can I just switch everything on together (I suspect not)?

Answer:

Q: In what order should I switch on everything?

A: No system's survival should depend on the order of turning power supplies on or off. Otherwise, if one supply should fail for some reason, have a momentary glitch, or the sequencing logic glitch, then the sequence is changed and the system may fail, resulting in poor field reliability. Making the system immune to sequencing order is one of a designer's design problems. I see this violated so much in recent designs that I repeat it: No system's survival should depend on the order of turning power supplies on or off.

Q: Should the bipolar transistors be on before I start the controller?

A: Yes and no, it depends. When the control is derived from the output, then if the power stage does not start up in the on condition, no power can get to the control circuit and the power supply never starts. If the power stage is on, then the control had better be coming on soon enough so that it has control before the output is reached or the load is damaged by over voltage.

Q: Is the use of soft-start critical?

A: Yes. See my tutorial on the buck converter regarding turn-on and turn-off trajectories in the state-plane.

Q: Can I just switch everything on together (I suspect not)?

A: Since power supplies do not usually have external regulated power to operate from, this is normally how it is done. Some power supplies have a so-called house-keeping power supply to provide regulated power before the main power comes on, but this house-keeping supply has no regulated supplies to operate from. Most non-power supply designers never have to worry about this, so it comes as a shock that they have to design so they get everything from the source or by boot-strapping from the source. Almost every one new to the field designs a power supply that will not turn on for their first design, or design one that turns on and overshoots damaging the load. Always for the housekeeping supply, or for systems that do not have a housekeeping supply, all power is turned on at once and the designer makes sure the control wins the race as power comes up. When the input power is non-monotonic in coming up (relay chatter), then things can get quite tricky.

You have hit upon one of the many design challenges the power supply designer faces.

Others may have a different perspective on these topics. Comments are always welcome.

Posted by Jerrold Foutz

 
< 上一篇   下一篇 >

滚动展示

24W开关电源 | 交流转直流开关电源 | 插墙系列立式、卧式开关电源
24W开关电源 | 交流转直流开关电源 | 插墙系列立式、卧式开关电源


15W开关电源 | 交流转直流开关电源 | 插墙系列立式、卧式开关电源
15W开关电源 | 交流转直流开关电源 | 插墙系列立式、卧式开关电源


48W开关电源 | 交流转直流开关电源 | 桌面系列开关电源
48W开关电源 | 交流转直流开关电源 | 桌面系列开关电源


18W开关电源 | 交流转直流开关电源 | 插墙系列立式、卧式开关电源
18W开关电源 | 交流转直流开关电源 | 插墙系列立式、卧式开关电源


EI-48 AC/AC AC/DC适配器
EI-48 AC/AC AC/DC适配器


18W开关电源 | 交流转直流开关电源 | 桌面系列开关电源
18W开关电源 | 交流转直流开关电源 | 桌面系列开关电源


LED路灯电源
LED路灯电源


车载充电器
车载充电器


12W开关电源 | 交流转直流开关电源 | 插墙系列立式、卧式开关电源
12W开关电源 | 交流转直流开关电源 | 插墙系列立式、卧式开关电源


24W开关电源 | 交流转直流开关电源 | 桌面系列开关电源
24W开关电源 | 交流转直流开关电源 | 桌面系列开关电源


100/120W桌面适配器
100/120W桌面适配器


SMPS - 200W开关电源/交流转直流/桌面系列开关电源SMPS
SMPS - 200W开关电源/交流转直流/桌面系列开关电源SMPS


SMPS - 9W开关电源/交流转直流/插墙系列立式、卧式SMPS
SMPS - 9W开关电源/交流转直流/插墙系列立式、卧式SMPS


180/220/300W桌面适配器
180/220/300W桌面适配器


EI-35 AC/AC AC/DC适配器
EI-35 AC/AC AC/DC适配器


SMPS - 5W开关电源/交流转直流/插墙系列立式、卧式SMPS
SMPS - 5W开关电源/交流转直流/插墙系列立式、卧式SMPS


SMPS - 90W开关电源/交流转直流/桌面系列开关电源SMPS
SMPS - 90W开关电源/交流转直流/桌面系列开关电源SMPS


60W开关电源 | 交流转直流开关电源 | 桌面系列开关电源
60W开关电源 | 交流转直流开关电源 | 桌面系列开关电源


Webbieworld SiteWars

Webbieworld Voting

最新产品

LED隧道灯电源
LED隧道灯电源
 Email询价
LED路灯电源
LED路灯电源
 Email询价
180/220/300W桌面适配器
180/220/300W桌面适配器
 Email询价
150W桌面适配器
150W桌面适配器
 Email询价
100/120W桌面适配器
100/120W桌面适配器
 Email询价
90W 桌面适配器
90W 桌面适配器
 Email询价
72W桌面式适配器
72W桌面式适配器
 Email询价
© 2009 Switching Power Supply(SMPS)-MOSO: Manufacturer&Supplier Specialized In Switching Power Supply.
Original Site Design by new-loong
stats